5 Marla House Construction in Lahore: Rates, Timeline & Payment Terms

Build your 5 marla house with CM Builders: grey structure at PKR 2,900 per sq ft, a complete house at PKR 5,400 per sq ft, a typical build of 5 months and a 1-year maintenance warranty.

1-Year Maintenance
Warranty
50% Advance,
Balance in Installments
Typical Build:
5 Months
5 Marla single story house, 630 P Block, Al Rehman Garden Phase 2, Lahore, built by CM Builders
SAFE · RELIABLE · PROFESSIONAL ·

5 MARLA HOUSE CONSTRUCTION

Building a 5 Marla House in Lahore With One Accountable Team

A 5 marla plot is a popular size for a family home in Lahore, and it rewards careful planning. CM Builders has built 5 marla homes in Al Rehman Garden Phase 2, including a 5-bedroom single-story house in P Block, and the same team handles your map, structure, finishing and handover. Fitting the rooms you need on a 5 marla plot is the main design decision. Our P Block project fits 5 bedrooms on a single story, and the 5 marla double-story homes on our projects page show how a second floor changes the layout.

PKR 2,900Grey structure, per sq ft
PKR 5,400Complete house, per sq ft
5 MonthsTypical build time

COST

What a 5 Marla House Costs in Lahore

Our rates are PKR 2,900 per sq ft for grey structure and PKR 5,400 per sq ft for a complete house with finishing. Your cost is the covered area on your approved map multiplied by the rate for the scope you choose.

Worked example for a 5 marla plot at PKR 2,900 and PKR 5,400 per sq ft
Covered areaGrey structureComplete house
Single story · about 1,125 sq ftPKR 3,262,500PKR 6,075,000
Double story · about 2,250 sq ftPKR 6,525,000PKR 12,150,000

These are planning examples. They use the covered-area figure on our cost estimator (225 sq ft per marla, per story), so a single-story 5 marla house is about 1,125 sq ft. Your real covered area comes from your approved map, and your written quote lists exactly what is included. Ask for it before you commit.

TIMELINE, PAYMENT & WARRANTY

What to Expect Before You Start

Timeline

5 Months

A 3 to 5 marla house typically takes about 5 months from the start of construction to handover. The exact schedule is confirmed in writing after the site visit.

Payment

50% Advance

50% advance to begin, and the balance in installments tied to construction stages.

Warranty

1 Year

Every house comes with a 1-year maintenance warranty.

HOW IT WORKS

How We Build a 5 Marla House Step by Step

Four stages, and you know what happens next at each one.

01

Site visit and written quote

We visit your plot, agree the scope (grey structure or complete house) and give you a written quote.

02

Map design and LDA/RUDA approval

Our architecture service prepares the map and handles LDA/RUDA approval. Typical turnaround is 15 to 25 days.

03

Grey structure

Foundation, columns, beams, slabs and brickwork. See our construction service and the grey structure page.

04

Finishing and handover

Tiles, paint, fittings and detailing through our finishing service, then handover with your 1-year maintenance warranty.

HOUSES WE BUILT

5 Marla and Nearby Sizes We Have Built

Real homes built by our team in Al Rehman Garden Phase 2. Open the projects page for photos and the full client reviews.

“CM Builders built our 5 Marla single-story home in P Block, Al Rehman Garden Phase 2, and the finished result speaks for itself — the classical facade and marble entrance came out beautifully. Fitting 5 bedrooms into a single-story 5 Marla plan wasn’t simple, but the team planned it well and stayed on top of quality throughout construction. We’re very satisfied and would recommend CM Builders to anyone.”

Homeowner · 630 P Block, Al Rehman Garden Phase 2

WHY CM BUILDERS

Build Your 5 Marla House With a Team You Can Visit

Our office is at Plaza No. 91, Hassan Commercial, Al Rehman Garden Phase 2, Lahore, open 10:00 AM to 8:00 PM. Walk in, see our completed projects and meet the people who will run your site. We also build in other societies, listed on our areas we build in page.

Living abroad? Overseas clients get live camera access to the site, not just photo updates (how it works). Compare our construction, finishing and architecture services, or contact us about your 5 marla plot.

FAQs

Questions, Answered

Grey structure is PKR 2,900 per sq ft and a complete house is PKR 5,400 per sq ft. For a single-story 5 marla house of about 1,125 sq ft that is PKR 3,262,500 for grey structure and PKR 6,075,000 for a complete house.

A 3 to 5 marla house typically takes about 5 months from the start of construction to handover. Your written schedule is confirmed after the site visit.

We take a 50% advance to begin, and the balance is paid in installments tied to construction stages. The written quote sets out the stages before work starts.

Yes. Every house comes with a 1-year maintenance warranty from CM Builders.

Yes. CM Builders handles LDA/RUDA map approval as part of its architecture and map service, working with whichever authority applies to your area. Typical turnaround is 15 to 25 days. The LDA/RUDA approval fee depends on your plot size and is not fixed, so contact us for an exact quote. See our architecture service for what the map package covers.

Yes. Double-story homes are part of our portfolio. A second floor roughly doubles the covered area, so cost and timeline change. We discuss both before the map is drawn.

Yes. Clients abroad get live camera access to their construction site, not just photo and video updates, and can start with a WhatsApp consultation. Read how it works on our overseas Pakistanis page.

Prefer a ready house instead? See houses for sale in Al Rehman Garden Phase 2.

5 Marla single story house, 630 P Block, Al Rehman Garden Phase 2, Lahore, built by CM Builders

Ready to Build Your 5 Marla House?

Send your plot details on WhatsApp and we will reply with next steps and a written quote.